- Home
- Government
- Departments
- Public Works
- Wastewater Department
- Wastewater Treatment Plant Upgrade
- Phase B (Rt. 8 Forcemain)
Phase B (Route 8 Forcemain)
December 2019
-
16-inch Force Main Piping
-
16-inch Force Main Piping
-
16-inch Force Main Piping
-
Pump Station Demolition
-
Pump Station Demolition
-
Force Main Installation
-
Force Main Installation
-
Oakwood Road After Pipe Install Before Road Repairs
-
Oakwood Road After Road Repaired
-
Force Main Installation
-
Force Main Installation
-
Force Main Installation
February 2020
No photos of Phase B were taken in February 2020 because the force main installation is complete. Photos will be posted in March of the installation of pumps and piping at the pump station.
August 2020
-
Pump Station Generator