From IDOT: The right lane on the eastbound McClugage Bridge, which carries U.S. 150 over the Illinois River, is closed in preparation for repairs. The load limit on the bridge is temporarily reduced to 14 tons until the repairs are completed next week.
Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, the use of alternate routes should be considered.