From IDOT: A lane reduction is occurring on the eastbound McClugage Bridge (U.S. 150). The lane reduction is part of ongoing ramp demolition and will occur during daytime hours. The reduction could last until Tuesday, March 8 and will require traffic entering from Adams Street to stop while work is underway.
Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered.